7th August Month meet

Thanks to Ken for opening his Garage on the first Sunday and showing his wonderful 4×8 HO layout,

Hand built buildings, running a DCC – NEC controller,

Layout consisted in a double loop track with interconnecting electrical points.

Running a steam locomotive pulling a rack of passenger coaches was great an a bit trickier around both loops and back to station.

Next Monthly Meet 4th September @ Damon’s NZR 1977 Matakoiti Viaduct

Leave a comment