Thanks to Ken for opening his Garage on the first Sunday and showing his wonderful 4×8 HO layout,
Hand built buildings, running a DCC – NEC controller,
Layout consisted in a double loop track with interconnecting electrical points.
Running a steam locomotive pulling a rack of passenger coaches was great an a bit trickier around both loops and back to station.
Next Monthly Meet 4th September @ Damon’s NZR 1977 Matakoiti Viaduct